US buyers sourcing castings overseas often wait weeks for a quote — or receive one that changes after tooling. In most cases the root cause is missing information in the RFQ. Here is what to include.
The essentials
- 3D model (STEP or IGES) plus a 2D drawing (PDF) with tolerances and revision level
- Material specification, e.g. ASTM B26 A356-T6, ASTM A536 65-45-12, ASTM A216 WCB
- Estimated annual usage (EAU) and typical order quantity
- Machining requirements — or a separate as-cast drawing if machining is done elsewhere
- Surface finish and coating: anodize, powder coat, e-coat, paint color
- Testing: X-ray, leak test pressure, mechanical tests, PPAP level
Information that prevents surprises
- Critical-to-function features and cosmetic surfaces
- Packaging requirements and ship-to location
- Incoterms (FOB, CIF, DDP) and target delivery dates
- Whether tooling will be customer-owned
What a good quote should include
- Recommended process and why
- Tooling cost, lead time and expected tool life
- Unit price with price breaks by quantity
- DFM suggestions with cost impact
- Sample and FAI timing
If you are unsure about any of these, send what you have. Our engineers will fill in the gaps with questions, not assumptions.
