Home / Casting Process
Casting Process
From Drawing to Delivered Part
A controlled, documented process — so the 10,000th casting matches the approved sample.
RFQ & Drawing Review
We review your 2D/3D files, material, tolerance and volume requirements and confirm the most economical process.
DFM & Quotation
Our engineers suggest draft, wall thickness, fillet and parting-line changes and quote tooling, unit price and lead time.
Simulation & Tooling Design
Mold-flow and solidification simulation predict shrinkage and porosity; gating, risers and cooling are optimized before steel is cut.
Tooling / Pattern Build
Permanent molds, die-casting dies, sand patterns, core boxes or wax tooling are built and tried out.
Melting & Metallurgy
Alloy charge is verified by spectrometer. Aluminum is degassed and refined; ductile iron is magnesium-treated and inoculated.
Molding & Pouring
Metal is cast by gravity, low pressure, high pressure, green/resin sand or investment shell — with process parameters recorded.
Cleaning & Heat Treatment
Gates and risers are removed; parts are shot-blasted and heat treated (T6, annealing, normalizing, Q&T) as specified.
CNC Machining
Bores, faces, threads and datums are machined in-house on CNC machining centers and lathes.
Surface Finishing
Anodizing, powder coating, e-coat, painting, plating or impregnation through qualified finishing partners.
Inspection & Testing
Dimensional (CMM), chemistry, mechanical, X-ray and leak testing per the control plan; FAI and PPAP-style documents.
Packing & Shipping
Rust protection, custom dunnage and export pallets; sea, air or consolidated shipments to your US location.
Simulation
Right the First Time
Casting defects are cheapest to fix on screen. We simulate mold filling and solidification to place gates, overflows and risers where they protect the critical areas of your part — sealing faces, bearing bores and thin walls.
- Fewer tooling modifications and faster PPAP
- Lower porosity in machined areas
- Higher casting yield and lower unit cost


Tooling
Tooling Built for Production Life
Die-casting dies in H13 hot-work steel, permanent molds, metal patterns and core boxes are designed in-house and built for your annual volume. Tooling is customer-owned and maintained by us at no extra cost during production.
Typical Project Timeline
| Stage | Typical duration* |
|---|---|
| Quote with DFM feedback | 2 business days |
| Tooling design & build | 4 – 8 weeks |
| T1 samples + FAI report | 1 – 2 weeks after tooling |
| Production (after sample approval) | 3 – 5 weeks |
| Ocean freight to US West / East Coast | approx. 3 – 5 weeks |
*Indicative only. Actual lead times depend on part complexity and are confirmed in each quotation.
Ready to quote your casting?
Send your 2D drawing or 3D model. Our engineers review every RFQ and reply with DFM feedback and pricing within 48 hours.